Liberia Municipal Water Project (LMWP)
Through the Liberia Municipal Water Project (LMWP), Tetra Tech is supporting the re-establishment of piped water supply in three of Liberias county capitalsRobertsport, Sanniquellie, and Voinjama. LMWP is working closely with local and national authorities on two fronts: 1) supporting engineering design efforts by establishing a local engineering design office; preparing draft Master Plans; and undertaking detailed design of the new and rehabilitated piped drinking water infrastructure; and 2) establishing the institutional frameworks and local capacity required to ensure the water systems are technically and financially sustainable.
Ensure broadly accessible, reliable and economically sustainable water and sanitation services for health, security, and prosperity. (Note that this Area does not include the household behavior aspects found in Element HL.6.6 or water issues directly relating to Agriculture – found in Element HL.6.7 or water issues.)
- ID Projet
US-GOV-1-LR-AID-669-TO-11-00002
- Statut de l'activité
- 3 - Completion
- Type d'aide
- C01 - Interventions de type projet
- % to Libéria
- 100.00
Organisations
- Accountable
- U.S. Agency for International Development
- Extending
- U.S. Agency for International Development
- Funding
- U.S. Agency for International Development
- Implementing
- The vendor name has been redacted in accordance with the Principled Exceptions outlined in the Office of Management and Budget Bulletin 12-01.
Versements par exercice fiscal, trimestre
Exercice fiscal |
Trimestre fiscal |
Montant (USD) |
Libéria Montant (USD) |
2016 |
Q4 |
219,166.61 |
219,166.61 |
2016 |
Q3 |
435,038.61 |
435,038.61 |
2016 |
Q2 |
404,729.75 |
404,729.75 |
2016 |
Q1 |
462,314.37 |
462,314.37 |
2015 |
Q4 |
502,360.30 |
502,360.30 |
2015 |
Q3 |
665,176.10 |
665,176.10 |
2015 |
Q2 |
1,042,292.40 |
1,042,292.40 |
2015 |
Q1 |
209,185.39 |
209,185.39 |
2014 |
Q4 |
719,603.03 |
719,603.03 |
2014 |
Q3 |
628,263.43 |
628,263.43 |
2014 |
Q2 |
679,148.04 |
679,148.04 |
2014 |
Q1 |
986,997.09 |
986,997.09 |
2013 |
Q4 |
1,266,374.80 |
1,266,374.80 |
2013 |
Q3 |
298,798.64 |
298,798.64 |
2013 |
Q2 |
977,924.83 |
977,924.83 |
2013 |
Q1 |
684,873.98 |
684,873.98 |
2012 |
Q4 |
804,952.82 |
804,952.82 |
2012 |
Q3 |
612,926.70 |
612,926.70 |
2012 |
Q2 |
559,001.06 |
559,001.06 |
2012 |
Q1 |
952,959.74 |
952,959.74 |
2011 |
Q4 |
1,110,772.25 |
1,110,772.25 |
2011 |
Q3 |
520,038.52 |
520,038.52 |
Engagements par exercice fiscal, trimestre
Exercice fiscal |
Trimestre fiscal |
Montant (USD) |
Libéria Montant (USD) |
2015 |
Q3 |
1,883,842.00 |
1,883,842.00 |
2015 |
Q1 |
735,340.00 |
735,340.00 |
2014 |
Q3 |
1,665,000.00 |
1,665,000.00 |
2013 |
Q3 |
3,500,000.00 |
3,500,000.00 |
2012 |
Q2 |
3,115,000.00 |
3,115,000.00 |
2011 |
Q1 |
4,000,000.00 |
4,000,000.00 |
Projections de CDMT par exercice fiscal
Exercice fiscal |
Montant (USD) |
Libéria Montant (USD) |
Code CRS |
% |
Inconnu
(0)
|
26.85
|
Approvisionnement en eau – systèmes à grande échelle
(14021)
|
73.15
|